Skip to product information
RockMow robotic lawn mower with four-wheel drive and front bumper on a transparent background
Side view of the RockMow Z1 robotic lawn mower showing four-wheel drive wheels, front bumper and obstacle detection sensors
Rear angle view of the RockMow Z1 robotic lawn mower showing four-wheel drive wheels, suspension and low-profile body design
Front angle view of the RockMow Z1 robotic lawn mower showing four-wheel drive wheels, front bumper and suspension
Front view of the RockMow Z1 robotic lawn mower showing obstacle detection sensors, front bumper and wide four-wheel stance
Top view of the RockMow Z1 robotic lawn mower showing the control panel, large drive wheels and rear suspension
Roborock

ROCKMOW Z1

£1,699.00 GBP
Taxes included. Shipping calculated at checkout.

The Roborock RockMow Z1 range is designed for larger and more demanding gardens, combining intelligent wire-free mowing with powerful terrain handling and smart app control. With models suitable for lawns from 1,500m² up to 5,000m², the Z1 range makes it easier to maintain a clean, consistent cut across complex outdoor spaces.

Each model features Four-Wheel Drive, an 80% / 39° maximum slope capability, Active Steering and Dynamic Suspension, helping the mower handle uneven ground, slopes, obstacles and multi-zone gardens with confidence. The 6-blade cutting system, 24cm cutting width, floating cutting deck and electric cutting height adjustment allow the mower to adapt to your lawn and deliver a neat, controlled finish.

Using Sentisphere Environmental Perception, Quad Vision obstacle avoidance and AI-powered mapping, the RockMow Z1 intelligently navigates your garden, avoids obstacles and plans efficient mowing routes without traditional boundary wires.

Model : Z115 4WD - 1500m²
Quantity
  • Lawns up to 5000m²

  • Wire free navigation

  • Four wheel-drive

  • Handles 80% slopes

  • Obstacle avoidance

  • Automatic recharging

Official UK Roborock Distributor
UK based support

Complete your setup

Enhance your RockMow Z1 with compatible add-ons and accessories, including edge cutting, replacement blades, installation accessories and protection options.

 
Side profile of the RockMow Z1 robotic lawn mower highlighting its large wheels and rugged four-wheel-drive design.

RockMow Z1 Series

The RockMow Z1 Series is designed for larger lawns and more demanding mowing needs, whether at home or in commercial settings. Built for challenging terrain, it combines intelligent mapping, all-wheel drive, active steering and strong cutting performance to keep grass maintained with less manual work.
01

Navigation & Terrain Capability

Advanced 4WD Terrain System

The RockMow Z1 Series is built for demanding gardens. Its four-wheel drive system, active steering and dynamic suspension work together to maintain traction, stability and control across slopes, uneven areas and changing lawn conditions.

This makes the Z1 Series well suited to gardens with banks, raised sections, dips, narrow paths and more complex layouts where simpler robotic mowers may struggle.
NAVIATION

Quad Vision Obstacle Avoidance

Quad Vision Obstacle AvoidanceThe RockMow Z1 Series uses Quad Vision obstacle avoidance to detect and respond to objects around the lawn. From garden furniture and trees to people, pets and uneven areas, the mower can adjust its route while continuing to mow efficiently.

Active Steering System

The patented Active Steering System gives the Z1 smoother, more controlled turning. This helps reduce dragging and scuffing on the lawn while improving movement through tighter areas.
 
02

Cutting Capabilities

Powerful Cutting, Cleaner Results.

The RockMow Z1 Series is designed to keep larger lawns looking neat with regular, intelligent mowing. Its six-blade cutting system, 24cm cutting width, floating deck and electric height adjustment work together to deliver an even finish across changing lawn conditions.

Fine clippings fall back into the lawn as the mower works, helping maintain a healthier-looking finish without the need to collect or empty a grass box.

6-Blade Cutting System

Six durable blades help the Z1 cut efficiently through thicker grass and maintain a clean, consistent lawn finish.

Floating Cutting Deck

The floating cutting deck follows the natural contours of the lawn, helping maintain a smoother cut across uneven ground.

24cm Cutting Width

A wider 24cm cutting width helps the Z1 cover larger lawns efficiently, reducing the number of passes needed for regular mowing.

Electric Cutting Height

Adjust the cutting height electronically from 20 to 70mm to suit your preferred finish, lawn condition and seasonal growth.

CUTTING

A Cleaner Cut, More Often

The RockMow Z1 Series is built for frequent, automated mowing, helping keep the lawn consistently maintained rather than waiting for the grass to become overgrown.
Roborock App

Control Your Mower From Anywhere

Manage zones, schedules, mowing progress and smart settings directly from the app.

4.8/5 Average rating
500K+ Reviews
20M+ Downloads
Hand holding a phone showing the mower app
Explore app features
Swipe to explore
Simple App Control

Simple App Control

The Roborock app is designed to make setup, control, and everyday mowing simple. From one clear settings screen, you can view mowing history, adjust schedules, check maintenance, manage rain protection, enable wildlife-friendly mowing, fine-tune obstacle avoidance, and access security settings. Everything is organised in a user-friendly way, so you can quickly find the features you need without digging through complicated menus.

04

Security, Protection & Weather Resistance

SECURITY

Smarter Mower Security

The RockMow Z1 Series includes built-in security features to help protect your mower while it is working outside. PIN access helps prevent unauthorised use, while movement alerts, alarm protection and 4G real-time tracking give you added reassurance across larger gardens, open areas and commercial sites.
RockMow Z1 robotic lawn mower detecting wet weather and returning to its charging station using rain sensing.

Rain Sensing

When rain is detected, the mower automatically returns to the charging station and resumes mowing once conditions clear.

Person rinsing the underside and cutting deck of a RockMow robot mower with a garden hose.

IPX6 Waterproof Rating

The Z1 Series is designed to withstand rain and can be rinsed with a hose for easier cleaning.

RockMow robotic lawn mower with four-wheel drive and front bumper on a transparent background

What's in the Box

Front angle view of the RockMow Z1 robotic lawn mower showing four-wheel drive wheels, front bumper and suspension
Front view of the RockMow Z1 robotic lawn mower showing obstacle detection sensors, front bumper and wide four-wheel stance

RockMow Z1 x1

RockMow robotic lawn mower charging station and docking base.

Charging Station x1

RTK Reference station used to as the navigation system for Roborck Mowers.
RTK Reference Station x1
RTK Extension cable coiled up.

RTK Extension Cable x1

Roborock Battery Charger 3 Pin with UK plug for charging station.

Battery Charger x1

Robot mower battery extension cable coiled up.

Battery Extension Cable x1

Set of extra blades and screws for a robot mower.

Extra Blade Set

ROCKMOW Z1

Charging Station Screws x6

ROCKMOW Z1

Hex Key x1

Roborock pegs for extension cable.

Lint-Free Cloth x1

RockMow Z1 robot mower displayed on a platform surrounded by rugged grassy terrain.